School Preservation Plan Overview: The Work to be Performed

These are the major categories of work.

LONG BEACH HIGH SCHOOL (est. 1971)
• Ventilation Improvements
• Door Replacement
• ADA-Compliance (incl. Ramps and Railings)
• Emergency Generator (Pool)
• Restroom Renovation
• Exterior Concrete Façade Restoration
• Mechanical, Electrical, Plumbing Upgrades
• State-of-the-Art Science Labs
• Classrooms and Resource Room Additions
• Media/Music/TV Studio
• Computer/Auto Repair Room Renovation
• Guidance/Administration Office Renovation
• New Athletic Field
• Parking and Roadway Improvements
• Pedestrian Greenway
• New/Relocated Tennis Courts

TOTAL: $28,769,600
Summary: Substantial interior construction to improve instructional environments; health & safety improvements; infrastructure upgrades; improved community resources.

LONG BEACH MIDDLE SCHOOL (est. 1953)
• Roof Replacement (Partial)
• Ventilation Improvements
• Door Replacement (Partial)
• ADA-Compliance Upgrades
• Security Improvements
• Phone and Public Address System Upgrades
• Restroom Renovation
• Boiler Replacement
• Library/Media Center Expansion/Relocation
• Main Office Relocation
• Guidance Office Renovation
• Conversion of Existing Space for Instruction/Accessibility
• New Athletic Field

TOTAL: $17,025,800
Summary: Substantial interior construction to improve instructional environments; health & safety improvements; infrastructure upgrades; improved community resources.

LIDO ELEMENTARY SCHOOL (est. 1953)
• Roof Replacement
• Masonry Improvements/Restoration
• Security Improvements
• ADA-Compliance Upgrades
• Mechanical, Electrical, Plumbing Upgrades
• New Pre-K Program Space
• New Classroom Space/Special Ed. Classrooms
• Cafeteria Addition/Improvement
• New and Improved Playground Areas

TOTAL: $29,685,400
Summary: New instructional space to accommodate increased school enrollment from relocated Pre-K; substantial infrastructure upgrades.

LINDELL ELEMENTARY SCHOOL (est. 1939)
• Exterior Façade Repair
• Roof Replacement
• Ventilation Improvements
• Emergency Lighting
• Elevator Addition for ADA-Compliance
• Additional ADA-Compliance Upgrades
• Security Improvements
• Phone and Public Address System Upgrades
• Restroom Renovation
• Window Replacement

TOTAL: $17,902,500*
Summary: Substantial infrastructure upgrades, especially for emergency conditions.

* Emergency funds have been dedicated for the repair of the exterior façade in the amount of $6,249,175. This means the total amount to be bonded for Lindell is actually $11,653,325.

EAST ELEMENTARY SCHOOL (est. 1926)
• Roof Replacement
• Exterior Concrete and Masonry Repairs
• Elevator Addition for ADA-Compliance
• Additional ADA-Compliance Upgrades
• Security Improvements
• Emergency Lighting Improvements
• Restroom Renovation
• Window Replacement (Partial)
• Upgraded Steam System/Controls

TOTAL: $3,467,200
Summary: Infrastructure upgrades and health/safety improvements to preserve building integrity.

WEST ELEMENTARY SCHOOL (est. 1960)
• Exterior Concrete and Masonry Repairs
• Door Replacement
• Emergency Lighting Improvements
• ADA-Compliance Upgrades
• Security Improvements
• Phone and Public Address System Upgrades
• Restroom Renovation
• Boiler Improvement

TOTAL: $2,125,200
Summary: Infrastructure upgrades and health/safety improvements to preserve building integrity.

BLACKHEATH PRE-K (est. 1950s)
• Demolition of Existing Buildings *
• Relocation of Program to Lido ES

* Demolition costs are budgeted with the work to be performed at Long Beach High School, since the Blackheath buildings are located on the high school campus and would be addressed at the time the site work and field addition are performed.

TOTAL SCHOOL PRESERVATION PLAN: $98,975,700